Semicon 2.0: ₹1,27,500 crore for chips
Semicon 2.0, the next phase of India's chip programme, was approved on 15 July 2026 with ₹1,27,500 crore.
On 15 July 2026 the Cabinet approved Semicon 2.0, the next phase of India's semiconductor programme, with an outlay of ₹1,27,500 crore. Built on six pillars beginning with chip design and with machines and materials, it follows Semicon 1.0 (the India Semiconductor Mission). About 105 start-ups are already designing chips. It is run by the Ministry of Electronics and Information Technology.
Test yourself
Question 1
What is the outlay of Semicon 2.0, approved in July 2026?
- A₹3,936 crore
- B₹62,500 crore
- C₹76,000 crore
- D₹1,27,500 crore
Show the answer and explanation
Correct answer: D
Explanation
Semicon 2.0 has an outlay of ₹1,27,500 crore.
₹76,000 crore was the first phase; ₹62,500 crore is the Mobile Phone Manufacturing Scheme.
- Concept
- Semicon 2.0 outlay
- Typical time
- 50 seconds
- Written from
- pib.gov.in
Question 2
Which ministry runs Semicon 2.0?
- AScience and Technology
- BElectronics and Information Technology
- CCommerce and Industry
- DHeavy Industries
Show the answer and explanation
Correct answer: B
Explanation
Semicon 2.0 is a MeitY programme.
It builds on the India Semiconductor Mission, Semicon 1.0.
- Concept
- Semicon 2.0 ministry
- Typical time
- 40 seconds
- Written from
- pib.gov.in
Question 3
Which is the first of the six pillars of Semicon 2.0?
- AChip design
- BWafer fabrication
- CPackaging
- DRare earth mining
Show the answer and explanation
Correct answer: A
Explanation
The first pillar is design, building on about 105 chip-design start-ups.
The second is machines and materials.
- Concept
- Semicon 2.0 pillars
- Typical time
- 50 seconds
- Written from
- pib.gov.in