April 2026 in current affairs: eleven stories for CUET

The month in eleven primary documents, among them a new Income-tax Act in force, a steady repo rate at the start of 2026-27 and Earth Day's theme. The assembly elections of April are in the March digest. The questions rotate out after twelve months; this page stays.

11
stories
32
questions from them still in practice
5
chapters covered

National

National

Two hydro projects in Arunachal: Kalai-II and Kamala

On 8 April 2026 the CCEA approved Kalai-II (1,200 MW, Lohit river) and Kamala (1,720 MW) hydro projects in Arunachal Pradesh.

On 8 April 2026 the Cabinet Committee on Economic Affairs approved two hydroelectric projects in Arunachal Pradesh. Kalai-II, 1,200 MW on the Lohit river in Anjaw district, costs ₹14,105.83 crore and is the first hydro project in the Lohit basin; it will be built by a joint venture of THDC India and the state. Kamala, 1,720 MW in Kamle, Kra Daadi and Kurung Kumey districts, costs ₹26,069.50 crore, will be built by a joint venture of NHPC and the state, and will also moderate floods in the Brahmaputra valley. The state gets 12 per cent free power from each, plus 1 per cent for local area development.

Test yourself

Question 1

MediumOriginal question

The 1,200 MW Kalai-II hydroelectric project, approved in April 2026, is on which river?

  1. ASubansiri
  2. BDibang
  3. CLohit
  4. DSiang
Your answer
Show the answer and explanation

Correct answer: C

Explanation

  1. Kalai-II is on the Lohit river in Anjaw district, the first hydro project in the Lohit basin.

  2. Subansiri Lower and Dibang are other projects in the state.

Concept
Kalai-II river
Typical time
50 seconds
Written from
pib.gov.in

Question 2

MediumOriginal question

What is the installed capacity of the Kamala hydroelectric project approved in April 2026?

  1. A1,200 MW
  2. B1,720 MW
  3. C2,000 MW
  4. D2,880 MW
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. Kamala has an installed capacity of 1,720 MW.

  2. 1,200 MW is Kalai-II; 2,000 MW is Subansiri Lower and 2,880 MW Dibang.

Concept
Kamala project capacity
Typical time
50 seconds
Written from
pib.gov.in

Question 3

HardOriginal question

Which public sector company will build the Kamala hydroelectric project with the Arunachal Pradesh government?

  1. ATHDC India Limited
  2. BNTPC Limited
  3. CSJVN Limited
  4. DNHPC Limited
Your answer
Show the answer and explanation

Correct answer: D

Explanation

  1. Kamala is a joint venture between NHPC and the state government.

  2. Kalai-II is the one with THDC India.

Concept
Kamala project developer
Typical time
65 seconds
Written from
pib.gov.in

Question 4

MediumOriginal question

What share of free power will Arunachal Pradesh receive from each of the two hydro projects approved in April 2026?

  1. A1 per cent
  2. B12 per cent
  3. C13 per cent
  4. D25 per cent
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. The state gets 12 per cent free power.

  2. A further 1 per cent is earmarked for the Local Area Development Fund.

Concept
Free power to the state
Typical time
50 seconds
Written from
pib.gov.in

Day →Week →

National

Jaipur Metro Phase 2: a 41 km north–south corridor

Jaipur Metro Phase 2, a 41 km north–south corridor with 36 stations costing ₹13,037.66 crore, was approved on 8 April 2026.

On 8 April 2026 the Cabinet approved Jaipur Metro Phase 2, a 41 km north–south corridor from Prahladpura to Todi Mod with 36 stations, at a cost of ₹13,037.66 crore. It will be built by Rajasthan Metro Rail Corporation, a 50:50 joint venture of the Government of India and the Government of Rajasthan, and will link the airport, Sitapura Industrial Area and SMS Hospital. Phase 1 is an 11.64 km corridor.

Test yourself

Question 1

MediumOriginal question

How long is the Jaipur Metro Phase 2 corridor approved in April 2026?

  1. A11.64 km
  2. B36 km
  3. C41 km
  4. D60 km
Your answer
Show the answer and explanation

Correct answer: C

Explanation

  1. Phase 2 is a 41 km north–south corridor with 36 stations.

  2. 11.64 km is the length of Phase 1.

Concept
Jaipur Metro Phase 2 length
Typical time
50 seconds
Written from
pib.gov.in

Question 2

EasyOriginal question

Jaipur Metro Phase 2 runs between which two points?

  1. AMansarovar and Badi Chaupar
  2. BPrahladpura and Todi Mod
  3. CSitapura and Ambabari
  4. DAirport and Vidhyadhar Nagar
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. The corridor runs from Prahladpura to Todi Mod.

  2. Sitapura, the airport, Ambabari and Vidhyadhar Nagar are places along it.

Concept
Jaipur Metro Phase 2 route
Typical time
40 seconds
Written from
pib.gov.in

Day →Week →

National

The Income-tax Act, 2025 comes into force

The Income-tax Act, 2025 came into force on 1 April 2026, replacing the 1961 Act and bringing in a single 'tax year'.

On 1 April 2026 the Income-tax Act, 2025 came into force, replacing the Income-tax Act, 1961. Parliament had passed it on 12 August 2025 and the President assented on 21 August 2025; the Central Board of Direct Taxes notified the Income-tax Rules, 2026 on 20 March 2026.

The Act rewrites the law in simpler language without changing tax policy. Its best-known change is the single 'tax year', which replaces the old pair of 'previous year' and 'assessment year'.

Test yourself

Question 1

EasyOriginal question

Which law did the Income-tax Act, 2025 replace when it came into force on 1 April 2026?

  1. AThe Income-tax Act, 1922
  2. BThe Central Goods and Services Tax Act, 2017
  3. CThe Income-tax Act, 1961
  4. DThe Wealth-tax Act, 1957
Your answer
Show the answer and explanation

Correct answer: C

Explanation

  1. The 2025 Act replaces the six-decade-old Income-tax Act, 1961.

  2. GST is an indirect tax under separate laws.

Concept
Income-tax Act, 2025
Typical time
40 seconds
Written from
pib.gov.in

Question 2

MediumOriginal question

Which term does the Income-tax Act, 2025 introduce in place of 'previous year' and 'assessment year'?

  1. AFinancial year
  2. BTax year
  3. CReturn year
  4. DIncome year
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. The Act introduces a single 'tax year', ending the two-term system.

  2. Under the 1961 Act, income of one year was assessed in the next, which is why two terms were needed.

Concept
Tax year under the new Act
Typical time
50 seconds
Written from
pib.gov.in

Question 3

MediumOriginal question

When did the President give assent to the Income-tax Bill, 2025?

  1. A12 August 2025
  2. B21 August 2025
  3. C20 March 2026
  4. D1 April 2026
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. Assent came on 21 August 2025, after Parliament passed the Bill on 12 August.

  2. 20 March 2026 is when the Rules were notified, and 1 April 2026 when the Act took effect.

Worth noting

Passed, assented, notified, in force: four dates, four different events. The question names which one it wants.

Concept
Enactment of the Income-tax Act, 2025
Typical time
50 seconds
Written from
pib.gov.in

Question 4

HardOriginal question

Which body notified the Income-tax Rules, 2026?

  1. AThe Central Board of Indirect Taxes and Customs
  2. BThe Central Board of Direct Taxes
  3. CThe GST Council
  4. DThe Reserve Bank of India
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. The CBDT notified the Rules on 20 March 2026.

  2. The CBDT administers direct taxes; CBIC handles customs and GST.

Concept
Income-tax Rules, 2026
Typical time
65 seconds
Written from
pib.gov.in

Week →

National

Census 2027 begins, and does it digitally

Census 2027's first phase, Houselisting and Housing, began on 1 April 2026: India's first digital census, with self-enumeration.

Phase I of Census 2027 — the Houselisting and Housing Census — began on 1 April 2026. The year in the name is the year of the population count; the field work starts well before it, which is the distinction a question is most likely to turn on.

This is India's first census with digital data capture and a self-enumeration facility: enumerators submit through a mobile app, and a household may fill in its own details rather than wait to be visited. President Droupadi Murmu was the first to self-enumerate, followed by Vice-President C.P. Radhakrishnan, the Prime Minister and the Home Minister. About 55,000 households used the facility on the day it opened, in Andaman and Nicobar Islands, Goa, Karnataka, Lakshadweep, Mizoram, Odisha, Sikkim and parts of Delhi.

The data is collected under the Census Act, 1948, which makes the individual record strictly confidential — the provision that makes an honest answer safe to give.

Test yourself

Question 1

EasyOriginal question

Phase I of Census 2027 — the Houselisting and Housing Census — began on which date?

  1. A1 January 2026
  2. B1 April 2026
  3. C16 June 2026
  4. D1 October 2026
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. The Houselisting and Housing Census is the first of the two phases, and it opened on 1 April 2026

  2. The year in the census's name is the year of the population count, not of the first field work, which is why the two dates differ

Concept
Census 2027 phasing
Typical time
40 seconds
Written from
pib.gov.in

Question 2

EasyOriginal question

What makes Census 2027 a first for India?

  1. AIt is the first census to count households rather than individuals
  2. BIt is the first census with digital data capture and a self-enumeration facility
  3. CIt is the first census conducted after a constitutional amendment
  4. DIt is the first census to be conducted in a single phase
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. Enumerators submit data through a mobile app, and a household may fill in its own details online rather than wait to be visited

  2. About 55,000 households used the self-enumeration facility on the day it opened

  3. The census has always counted both households and individuals, and it still runs in two phases

Concept
Digital census and self-enumeration
Typical time
40 seconds
Written from
pib.gov.in

Question 3

MediumOriginal question

Under which law is the information a household gives to the census kept confidential?

  1. AThe Right to Information Act, 2005
  2. BThe Registration of Births and Deaths Act, 1969
  3. CThe Census Act, 1948
  4. DThe Digital Personal Data Protection Act, 2023
Your answer
Show the answer and explanation

Correct answer: C

Explanation

  1. The Census Act, 1948 governs the exercise and makes the individual record strictly confidential

  2. Confidentiality is what makes an honest answer safe to give, so it is stated in the announcement itself rather than left to be assumed

  3. Births and deaths are registered under a separate 1969 Act, which is a continuous record and not a decennial count

Concept
The statutory basis of the census
Typical time
45 seconds
Written from
pib.gov.in

Week →

Government Schemes & Policy

Government Schemes & Policy

A Bharat Maritime Insurance Pool backed by ₹12,980 crore

The Cabinet approved a Bharat Maritime Insurance Pool with a ₹12,980 crore sovereign guarantee on 18 April 2026.

On 18 April 2026 the Union Cabinet approved a domestic insurance pool, the Bharat Maritime Insurance Pool, with a sovereign guarantee of ₹12,980 crore, so that ships carrying cargo to and from Indian ports stay insured even through volatile sea routes. It covers hull and machinery, cargo, protection and indemnity (P&I) and war risk.

Indian vessels had depended heavily on the International Group of P&I Clubs for third-party liability cover, which can be withdrawn under sanctions or geopolitical tension. The pool was launched on 12 May 2026.

Test yourself

Question 1

EasyOriginal question

What sovereign guarantee backs the Bharat Maritime Insurance Pool approved in April 2026?

  1. A₹950 crore
  2. B₹5,000 crore
  3. C₹12,980 crore
  4. D₹25,060 crore
Your answer
Show the answer and explanation

Correct answer: C

Explanation

  1. The pool carries a sovereign guarantee of ₹12,980 crore.

  2. ₹950 crore is roughly the pool's own combined underwriting capacity.

Concept
Bharat Maritime Insurance Pool
Typical time
40 seconds
Written from
pib.gov.in

Question 2

MediumOriginal question

Why was the Bharat Maritime Insurance Pool created?

  1. ATo keep Indian trade insured if foreign cover is withdrawn over sanctions or conflict
  2. BTo insure fishermen's boats against cyclones
  3. CTo replace the Life Insurance Corporation
  4. DTo fund new shipbuilding yards
Your answer
Show the answer and explanation

Correct answer: A

Explanation

  1. The pool gives domestic cover so trade continues if international insurers withdraw under sanctions or geopolitical tension.

  2. It covers hull and machinery, cargo, P&I and war risk.

Concept
Purpose of the maritime insurance pool
Typical time
50 seconds
Written from
pib.gov.in

Question 3

HardOriginal question

In marine insurance, what does 'P&I' cover, which Indian ships had largely bought from foreign clubs?

  1. ADamage to the ship's own hull and engines
  2. BDelay in port clearance
  3. CThird-party liabilities such as oil pollution, wreck removal and crew injury
  4. DCurrency losses on freight payments
Your answer
Show the answer and explanation

Correct answer: C

Explanation

  1. Protection and Indemnity covers liabilities to others: oil pollution, wreck removal, cargo damage, crew injury and collisions.

  2. The ship's own hull and engines fall under hull and machinery cover, a separate risk.

Concept
P&I insurance
Typical time
65 seconds
Written from
pib.gov.in

Week →

Government Schemes & Policy

PMGSY-III extended to March 2028

PMGSY-III was extended to March 2028 on 18 April 2026, with the outlay revised to ₹83,977 crore.

On 18 April 2026 the Cabinet approved continuing Pradhan Mantri Gram Sadak Yojana-III beyond March 2025 up to March 2028, with the outlay revised to ₹83,977 crore from ₹80,250 crore. PMGSY-III consolidates through routes and major rural links that connect habitations to rural agricultural markets (GrAMs), higher secondary schools and hospitals. Bridges in hilly areas get until March 2029, and 161 long-span bridges were cleared. The scheme is run by the Ministry of Rural Development.

Test yourself

Question 1

EasyOriginal question

Up to when was PMGSY-III extended in April 2026 for roads and plain-area bridges?

  1. AMarch 2028
  2. BMarch 2026
  3. CMarch 2029
  4. DMarch 2030
Your answer
Show the answer and explanation

Correct answer: A

Explanation

  1. Roads and plain-area bridges get until March 2028.

  2. March 2029 is the deadline for bridges in hilly areas.

Concept
PMGSY-III extension
Typical time
40 seconds
Written from
pib.gov.in

Question 2

MediumOriginal question

To what was the outlay of PMGSY-III revised in April 2026?

  1. A₹70,125 crore
  2. B₹80,250 crore
  3. C₹83,977 crore
  4. D₹1,00,000 crore
Your answer
Show the answer and explanation

Correct answer: C

Explanation

  1. The outlay was revised to ₹83,977 crore.

  2. ₹80,250 crore was the original outlay.

Concept
PMGSY-III outlay
Typical time
50 seconds
Written from
pib.gov.in

Question 3

MediumOriginal question

PMGSY-III upgrades rural roads that connect habitations to which of these?

  1. AAirports and railway stations
  2. BNational highways only
  3. CIndustrial parks
  4. DRural agricultural markets, higher secondary schools and hospitals
Your answer
Show the answer and explanation

Correct answer: D

Explanation

  1. PMGSY-III links habitations to GrAMs, higher secondary schools and hospitals.

  2. It is run by the Ministry of Rural Development.

Concept
PMGSY-III purpose
Typical time
50 seconds
Written from
pib.gov.in

Week →

Government Schemes & Policy

Fertiliser subsidy for kharif 2026: about ₹41,534 crore

On 8 April 2026 the Cabinet set Nutrient Based Subsidy rates for kharif 2026, needing about ₹41,534 crore.

On 8 April 2026 the Cabinet fixed the Nutrient Based Subsidy rates on phosphatic and potassic fertilisers, including DAP, for the kharif season 2026 (1 April to 30 September 2026). The requirement is about ₹41,533.81 crore, around ₹4,317 crore more than kharif 2025. The scheme, in force since 1 April 2010, covers 28 grades of P&K fertilisers; urea is outside it. It is run by the Department of Fertilizers.

Test yourself

Question 1

MediumOriginal question

The Nutrient Based Subsidy rates approved in April 2026 apply to which fertilisers?

  1. AUrea only
  2. BPhosphatic and potassic fertilisers, including DAP
  3. COrganic manure
  4. DNano urea only
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. NBS covers phosphatic and potassic (P&K) fertilisers, including DAP and NPK grades.

  2. Urea is subsidised separately, outside the NBS scheme.

Concept
NBS coverage
Typical time
50 seconds
Written from
pib.gov.in

Question 2

HardOriginal question

Since when has the subsidy on P&K fertilisers been governed by the Nutrient Based Subsidy scheme?

  1. A1 April 2004
  2. B1 April 2010
  3. C1 April 2016
  4. D1 April 2020
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. The NBS scheme has governed P&K subsidy since 1 April 2010.

  2. The kharif 2026 rates run from 1 April to 30 September 2026.

Concept
NBS scheme start
Typical time
65 seconds
Written from
pib.gov.in

Day →Week →

Economy & Business

Economy & Business

The first policy of 2026-27: repo rate held at 5.25 per cent

The MPC held the repo rate at 5.25% on 8 April 2026 and projected 6.9% growth and 4.6% inflation for 2026-27.

The Monetary Policy Committee's 60th meeting, from 6 to 8 April 2026 — the first of 2026-27 — unanimously kept the repo rate at 5.25 per cent with a neutral stance.

The Reserve Bank projected growth for 2026-27 at 6.9 per cent and CPI inflation at 4.6 per cent, higher than in 2025-26, citing energy prices and supply disruption from the conflict in West Asia, and possible El Niño conditions, as upside risks to inflation. On the new CPI series, inflation had risen to 3.2 per cent in February 2026.

Test yourself

Question 1

MediumOriginal question

In April 2026, what CPI inflation did the Reserve Bank project for 2026-27?

  1. A2.0 per cent
  2. B3.2 per cent
  3. C4.6 per cent
  4. D6.9 per cent
Your answer
Show the answer and explanation

Correct answer: C

Explanation

  1. The projection for 2026-27 was 4.6 per cent.

  2. 6.9 per cent is the growth projection, and 3.2 per cent the February 2026 reading.

Concept
RBI inflation projection for 2026-27
Typical time
50 seconds
Written from
rbi.org.in

Question 2

MediumOriginal question

What real GDP growth did the Reserve Bank project for 2026-27 in April 2026?

  1. A6.2 per cent
  2. B6.9 per cent
  3. C7.3 per cent
  4. D7.6 per cent
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. Growth for 2026-27 was projected at 6.9 per cent.

  2. 7.6 per cent is the new-series estimate for 2025-26, the year just ended.

Concept
RBI growth projection for 2026-27
Typical time
50 seconds
Written from
rbi.org.in

Question 3

EasyOriginal question

Which meeting of the Monetary Policy Committee, held in April 2026, opened 2026-27?

  1. AThe 57th
  2. BThe 59th
  3. CThe first of a newly formed committee
  4. DThe 60th
Your answer
Show the answer and explanation

Correct answer: D

Explanation

  1. The April 2026 meeting was the MPC's 60th; it kept the repo rate at 5.25 per cent.

  2. The 59th was in February 2026 and the 57th in October 2025.

Concept
MPC meetings in 2026
Typical time
40 seconds
Written from
rbi.org.in

Question 4

HardOriginal question

Which risks did the Reserve Bank name in April 2026 as pushing inflation up in 2026-27?

  1. AEnergy prices from the West Asia conflict, and possible El Niño
  2. BA fall in the rupee after the India–EU FTA
  3. CA record rabi harvest
  4. DHigher GST rates
Your answer
Show the answer and explanation

Correct answer: A

Explanation

  1. The RBI cited persistently high energy prices due to the West Asia conflict and possible El Niño conditions as upside risks.

  2. A strong rabi crop was named as a comfort, not a risk.

Concept
Inflation risks, 2026-27
Typical time
65 seconds
Written from
rbi.org.in

Day →Week →

Science & Space

Science & Space

SACHET and Cell Broadcast: disaster alerts on every phone

In April 2026 DoT and NDMA began pan-India tests of C-DOT's Cell Broadcast disaster alerts, alongside the SACHET system.

In April 2026 the Department of Telecommunications and the National Disaster Management Authority began pan-India testing of an indigenous Cell Broadcast system for disaster alerts, built by C-DOT. Cell Broadcast sends an alert to every phone in a defined area at the same moment, which matters for tsunamis, earthquakes, lightning and gas leaks.

It adds to SACHET, the Integrated Alert System also built by C-DOT, which runs in all 36 states and union territories on the ITU's Common Alerting Protocol and has sent over 134 billion geo-targeted SMS alerts in more than 19 languages.

Test yourself

Question 1

EasyOriginal question

Which organisation developed India's indigenous Cell Broadcast disaster-alert system tested in April 2026?

  1. AISRO
  2. BDRDO
  3. CBSNL
  4. DC-DOT
Your answer
Show the answer and explanation

Correct answer: D

Explanation

  1. The Centre for Development of Telematics (C-DOT), the Department of Telecommunications' R&D centre, built it.

  2. C-DOT also built SACHET, the SMS-based alert system.

Concept
Cell Broadcast alerts
Typical time
40 seconds
Written from
pib.gov.in

Question 2

MediumOriginal question

What does Cell Broadcast do that SMS alerts do not?

  1. AWorks only on smartphones with an app
  2. BSends alerts only in English
  3. CReaches every phone in an area at the same moment
  4. DCharges the user per message
Your answer
Show the answer and explanation

Correct answer: C

Explanation

  1. Cell Broadcast transmits to all devices in a defined area simultaneously, giving near real-time delivery.

  2. SMS goes number by number, which is slower when every second counts, as in a tsunami.

Concept
Cell Broadcast versus SMS
Typical time
50 seconds
Written from
pib.gov.in

Question 3

HardOriginal question

On which standard is SACHET, India's Integrated Alert System, based?

  1. AThe Global Positioning System
  2. BThe Common Alerting Protocol recommended by the ITU
  3. CThe NavIC messaging service alone
  4. DThe WMO's Global Telecommunication System
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. SACHET is built on the Common Alerting Protocol, which the International Telecommunication Union recommends.

  2. It runs in all 36 states and union territories and has sent over 134 billion alerts.

Concept
SACHET's standard
Typical time
65 seconds
Written from
pib.gov.in

Week →

Science & Space

India's first gold at the European Girls' Mathematical Olympiad

Shreya Mundhada won India's first gold at the European Girls' Mathematical Olympiad, Bordeaux, April 2026; India placed 6th.

At the 15th European Girls' Mathematical Olympiad (EGMO), held in Bordeaux, France, from 9 to 15 April 2026, India's four-member team won one gold, one silver and one bronze. Shreya Shantanu Mundhada of Mumbai won India's first-ever EGMO gold, and the team placed 6th of 67 countries, its best since its debut in 2015.

Test yourself

Question 1

MediumOriginal question

Where was the European Girls' Mathematical Olympiad 2026 held, at which India won its first gold?

  1. AShanghai, China
  2. BTashkent, Uzbekistan
  3. CVilnius, Lithuania
  4. DBordeaux, France
Your answer
Show the answer and explanation

Correct answer: D

Explanation

  1. EGMO 2026 was held in Bordeaux, France, from 9 to 15 April.

  2. India placed 6th of 67 countries.

Concept
EGMO 2026 venue
Typical time
50 seconds
Written from
pib.gov.in

Question 2

EasyOriginal question

Who won India's first-ever gold at the European Girls' Mathematical Olympiad, in 2026?

  1. AShreya Shantanu Mundhada
  2. BSanjana Philo Chacko
  3. CShivani Barath Kumar
  4. DShrimoyee Bera
Your answer
Show the answer and explanation

Correct answer: A

Explanation

  1. Shreya Shantanu Mundhada of Mumbai won gold.

  2. Sanjana Philo Chacko won silver and Shivani Barath Kumar bronze.

Concept
First EGMO gold
Typical time
40 seconds
Written from
pib.gov.in

Week →

Environment & Climate

Environment & Climate

Earth Day 2026: 'Our Power, Our Planet'

Earth Day, 22 April 2026, was marked on the global theme 'Our Power, Our Planet'.

Earth Day, 22 April, was marked in 2026 on the global theme 'Our Power, Our Planet'. The Ministry of Earth Sciences held its observance at Prithvi Bhavan, New Delhi, with a call for climate justice and equitable sustainability.

Test yourself

Question 1

EasyOriginal question

What was the theme of Earth Day 2026?

  1. APlanet vs. Plastics
  2. BInvest in Our Planet
  3. COur Power, Our Planet
  4. DRestore Our Earth
Your answer
Show the answer and explanation

Correct answer: C

Explanation

  1. The 2026 theme was 'Our Power, Our Planet'.

  2. It repeated the 2025 theme; 'Planet vs. Plastics' was 2024 and 'Invest in Our Planet' 2023.

Concept
Earth Day 2026
Typical time
40 seconds
Written from
pib.gov.in

Question 2

MediumOriginal question

On which date is Earth Day observed every year?

  1. A22 March
  2. B22 April
  3. C5 June
  4. D16 September
Your answer
Show the answer and explanation

Correct answer: B

Explanation

  1. Earth Day falls on 22 April.

  2. 5 June is World Environment Day, 22 March World Water Day and 16 September World Ozone Day.

Concept
Environmental days
Typical time
50 seconds
Written from
pib.gov.in

Week →

Every item on this page, and the document it came from

Sources on this page · Last verified:

  1. Cabinet approves Investment Proposal for construction of 1720 MW Kamala Hydro Electric Project in Kamle, Kra Daadi & Kurung Kumey Districts of Arunachal Pradesh — Press Information Bureau, Ministry of Power
  2. Cabinet approves Jaipur Metro Project Phase-2 — Press Information Bureau, Ministry of Housing and Urban Affairs
  3. Income-tax Act, 2025 comes into force from today (1st April, 2026) — Press Information Bureau, Ministry of Finance
  4. Census 2027: World's largest census exercise begins with Houselisting and Housing Census (HLO) — Press Information Bureau, Ministry of Home Affairs
  5. Cabinet approves proposal for creation of 'Bharat Maritime Insurance Pool' with a sovereign guarantee of Rs 12,980 crore — Press Information Bureau, Cabinet
  6. Cabinet approves Continuation of Pradhan Mantri Gram Sadak Yojana-III (PMGSY-III) beyond March 2025 upto March 2028 — Press Information Bureau, Ministry of Rural Development
  7. Cabinet approves Nutrient Based Subsidy (NBS) rates for Kharif Season, 2026 on Phosphatic and Potassic (P&K) fertilizers — Press Information Bureau, Ministry of Chemicals and Fertilizers
  8. Monetary Policy Statement, 2026-27: Resolution of the Monetary Policy Committee, April 6 to 8, 2026 — Reserve Bank of India
  9. Pan-India Testing of Indigenous Cell Broadcast System Underway for Rapid Disaster Alerts — Press Information Bureau, Ministry of Communications
  10. Indian Team Achieves Historic Success at the 15th European Girls' Mathematical Olympiad (EGMO) 2026 — Press Information Bureau, Department of Atomic Energy
  11. Ministry of Earth Sciences Celebrates Earth Day 2026; Calls for "Climate Justice" and Equitable Sustainability — Press Information Bureau, Ministry of Earth Sciences