National
Two hydro projects in Arunachal: Kalai-II and Kamala
On 8 April 2026 the CCEA approved Kalai-II (1,200 MW, Lohit river) and Kamala (1,720 MW) hydro projects in Arunachal Pradesh.
On 8 April 2026 the Cabinet Committee on Economic Affairs approved two hydroelectric projects in Arunachal Pradesh. Kalai-II, 1,200 MW on the Lohit river in Anjaw district, costs ₹14,105.83 crore and is the first hydro project in the Lohit basin; it will be built by a joint venture of THDC India and the state. Kamala, 1,720 MW in Kamle, Kra Daadi and Kurung Kumey districts, costs ₹26,069.50 crore, will be built by a joint venture of NHPC and the state, and will also moderate floods in the Brahmaputra valley. The state gets 12 per cent free power from each, plus 1 per cent for local area development.
Test yourself
Question 1
The 1,200 MW Kalai-II hydroelectric project, approved in April 2026, is on which river?
- ASubansiri
- BDibang
- CLohit
- DSiang
Show the answer and explanation
Correct answer: C
Explanation
Kalai-II is on the Lohit river in Anjaw district, the first hydro project in the Lohit basin.
Subansiri Lower and Dibang are other projects in the state.
- Concept
- Kalai-II river
- Typical time
- 50 seconds
- Written from
- pib.gov.in
Question 2
What is the installed capacity of the Kamala hydroelectric project approved in April 2026?
- A1,200 MW
- B1,720 MW
- C2,000 MW
- D2,880 MW
Show the answer and explanation
Correct answer: B
Explanation
Kamala has an installed capacity of 1,720 MW.
1,200 MW is Kalai-II; 2,000 MW is Subansiri Lower and 2,880 MW Dibang.
- Concept
- Kamala project capacity
- Typical time
- 50 seconds
- Written from
- pib.gov.in
Question 3
Which public sector company will build the Kamala hydroelectric project with the Arunachal Pradesh government?
- ATHDC India Limited
- BNTPC Limited
- CSJVN Limited
- DNHPC Limited
Show the answer and explanation
Correct answer: D
Explanation
Kamala is a joint venture between NHPC and the state government.
Kalai-II is the one with THDC India.
- Concept
- Kamala project developer
- Typical time
- 65 seconds
- Written from
- pib.gov.in
Question 4
What share of free power will Arunachal Pradesh receive from each of the two hydro projects approved in April 2026?
- A1 per cent
- B12 per cent
- C13 per cent
- D25 per cent
Show the answer and explanation
Correct answer: B
Explanation
The state gets 12 per cent free power.
A further 1 per cent is earmarked for the Local Area Development Fund.
- Concept
- Free power to the state
- Typical time
- 50 seconds
- Written from
- pib.gov.in